| Project: | Survey of the Palatine |
| Client: | Special Superintendence for the Colosseum and the archaeological area of Rome |
| Country: | Italy, Rome |
| Duration: | 20 days |
| Start: | January 2017 |
| End: | January 2017 |
Project description: During the requalification project of the top floor of the Palatine building, a survey of the building and of the surrounding context was carried out.
The work was completed through the following phases: topographic framing of the building footprint; main traverse along the perimeter of the survey area; measurement of support points for the images, all performed with a total station with 1-arcsecond precision; detailed (celerimetric) survey of the characteristic points of the building; survey of the points of interest of the façades — windows, doors, reliefs; photographic documentation; production of orthophotos.